Inspection
Oct 29, 2026
3 recorded violations
Official Wording
(A)-(P) Person-In-Charge-Duties (Pf)
Inspector’s Notes
Plan review and engineer report required to auth prep in basement. Advised to stop any construction until approval is given. This should be done asap. Refer to email with all documentation attached to address this issue.
In Plain English
An issue that does not fit the common categories. Check the official wording for details.
More about other findingOfficial Wording
Backflow Prevention (P)
Inspector’s Notes
Observed a 3 bay sink utilized for food prep. Provide a quote via email from a licensed plumber on letter head for installation of an air gap. All work should be reviewed by isdhealth with a plan review and an engineering work.
In Plain English
The business had issues with hot or cold running water, plumbing, drains, backflow prevention, or sewage disposal. Some of these, like no hot water, can force a temporary closure until fixed.
More about water, plumbing, or sewage problemsOfficial Wording
Floor and Wall Junctures Coved and Enclosed or Sealed (C)
Inspector’s Notes
Provide proper sealing on the basement floor for proper cleaning and sanitizing. Observed multiple holes and opening in ceiling and wall. Repair
In Plain English
Floors, walls, ceilings, lighting, ventilation, or garbage areas needed repair or cleaning. These are usually less urgent than food-handling problems but still need to be fixed.
More about building upkeep issuesOfficial record from Boston Inspectional Services Department, Oct 29, 2026 · Original Source